Skip to main content

Tir Collective prepared the Landscape and Visual Impact Assessment for an 18no. wind turbine scheme located on an upland site in Powys, Mid-Wales.

Key considerations of the site included its proximity adjacent to the Tirgwynt wind farm and the nearby Mynydd Clogau wind farm. Several residential properties are also located within 2km of the site; the potential impacts of the proposals were considered as part of the Residential Visual Amenity Assessment (RVAA).

Key Project Features

  • 18no. wind turbines
  • Blade tip height of 125m
  • Site located within a pre-assessed area for Wind energy

Services Provided

See our other projects